London Resort
  • Our Vision
  • The Benefits
  • The Project
  • Planning
  • Community
  • Suppliers
  • News
  • The Team
  • Stay in touch

The London Resort PEIR Appendices

Please find below a full breakdown of the Preliminary Environmental Information Report (PEIR) appendices:

Volume 3 Cover Contents

4.1 Assessment reports for the eleven site options

7.1 Detailed Policy

7.2 Detailed Baseline

8.1 Detailed Policy

8.2 Detailed Baseline

8.3 Literature

11.1 Landscape and Visual Baseline Assessment

11.2 Preliminary Arboricultural Impact Assessment

12.1 Ecology Baseline Report Part 1

12.1 Ecology Baseline Report Part 2

12.2 Green Infrastructure Strategy

12.3 Calculations

13.1 Consultation Responses

13.2 Baseline

14.1 Site Gazetteer

14.2 DBA

14.3 Holocenearchaeology

14.4 Historiclandscape

14.5 Palaeodba

14.6 Geophys

14.7 Geophysics

15.1 Baseline Noise Monitoring

15.2 Construction Noise Assessments

15.3 Operational Traffic Assessments

16.1 Construction Methodology

18.1 Phase 1 Geoenvironmental

18.2 Phase 1 Geoenvironmental

18.3 Geotech And Geoenvironmental

18.4 Factual Report Ground Investigation

18.5 Outline Remediation And Earthworks Strategy

18.6 Geo-environmental assessment

21.1 Cumulative Stage 1 'Other Development'

  • Our Vision
  • The Benefits
  • The Project
  • Planning
  • Community
  • Suppliers
  • News
  • The Team
  • Stay in touch

Telephone
0800 470 0043

Monday - Friday: 9am - 5.30pm

Email:

info@londonresortcompany.co.uk

Write
FREEPOST: LONDON RESORT CONSULTATION

Media Enquiries
For further information, please contact

Sentient Communications

info@teamsentient.com

Privacy Policy Cookie Preferences

© London Resort Company Holdings 2022. All rights reserved.